[Close] 

Project Controls Specialist - Mining Specific

Responsibilities:

  • Compile the baseline schedule then track the schedule and make necessary changes to schedule as required.
  • Provide contract administration including but not limited to tender documentation, request for proposal, addendums, bid opening, evaluation, awards, meetings, change management, financial reporting and closeout.
  • Report Key Performance Indicators (KPI's) as required to the owner / EPCM.
  • Make schedule forecasts to foresee problem areas on the schedule and notify management when these situations arise especially when they affect the critical path.
  • Break schedule down into shorter terms for easier management and tracking (example: 3 week look ahead).
  • Communicate with senior management in accordance with the limits of authority.
  • Track actual costs of the construction activities and compare them to the budgeted costs for each work section and report accordingly.
  • Compare percentage completion to date and costs for each work section to predict potential cost overruns and/or underruns as applicable.
  • Prepare estimates for evaluating the cost of scope changes to the contract.
  • Provide administrative assistance to the Project Manager.
  • Maintains and keeps of log of all documents transmitted to the client.

EXPERIENCE

5 years experience in project controls.

COMPUTER APPLICATIONS USED

  • Primavera P6
  • Microsoft Word
  • Microsoft Excel
  • Microsoft PowerPoint
  • Microsoft Project
  • AutoCAD
Cementation USA
https://cementation. applicantpro. com


Don't Be Fooled

The fraudster will send a check to the victim who has accepted a job. The check can be for multiple reasons such as signing bonus, supplies, etc. The victim will be instructed to deposit the check and use the money for any of these reasons and then instructed to send the remaining funds to the fraudster. The check will bounce and the victim is left responsible.